| County |
| |
| Average Costs |
| $364,194.91 |
| |
| $116,233.33 |
| 1.13% |
| 32.86% |
| 0.09% |
| 10.08% |
| 0.30% |
| 0.45% |
| 0.21% |
| 0.00% |
| 0.42% |
| 0.42% |
| 1.65% |
| 1.20% |
| 0.11% |
| 0.11% |
| 0.10% |
| 0.03% |
| 1.43% |
| 0.17% |
| 0.09% |
| 0.30% |
| 0.27% |
| 1.92% |
| 0.08% |
| 0.42% |
| 0.92% |
| 0.82% |
| 1.74% |
| 0.11% |
| 0.88% |
| 0.04% |
| 0.11% |
| 2.67% |
| 0.01% |
| 2.00% |
| 2.23% |
| 2.02% |
| 1.76% |
| 0.04% |
| 0.63% |
| 0.01% |
| 0.30% |
| 0.12% |
| 0.21% |
| 1.60% |
| 0.66% |
| 0.22% |
| 0.51% |
| 0.21% |
| 0.00% |
| 0.59% |
| 0.25% |
| 1.00% |
| 0.28% |
| 0.80% |
| 0.92% |
| 1.47% |
| 0.27% |
| 2.38% |
| 0.57% |
| 2.09% |
| 0.13% |
| 0.72% |
| 0.21% |
| 1.05% |
| 2.55% |
| 0.39% |
| 0.90% |
| 0.04% |
| 1.12% |
| 0.55% |
| 1.09% |
| 0.54% |
| 1.42% |
| 0.23% |
| 0.07% |
| 0.13% |
| 0.00% |
| 0.47% |
| 0.12% |
| 0.00% |
| 0.26% |
| 0.95% |
| 0.46% |
| 0.19% |
| 0.14% |
| 0.30% |
| 0.09% |
| 0.02% |
| 0.02% |
| 0.22% |
| 0.04% |
| 0.32% |
|
| State |
| Construction Costs |
| |
| Lot Value |
| Builder Profit |
| Log/Timberframe Package |
| Logs stacked to roof level |
| Dry-In |
| Arichitect, Engineering, Plans & Blueprints |
| Permits - City/County |
| Utility Connection Fees |
| Demolition |
| Clearing/Stakeout |
| Rough Grading/Shoring/Fill |
| Private Septic System |
| Domestic Water/Well |
| Pump House & Pressure Water System |
| Rock |
| Water Hookups |
| Sewer Hookups |
| Site Excavation |
| Ground Plumbing |
| Ground Mechanicals |
| Ground Electric |
| Underground Utilities |
| Foundation walls |
| Retaining walls |
| Concrete slab poured - garage |
| Concrete slab poured - house |
| Superior walls (precast) |
| Foundation complete |
| Structural Masonry |
| Rough framing materials |
| Structural steel |
| Mfg. floor trusses/components |
| Rough framing labor |
| Lightweight concrete interior floors |
| Rough HVAC |
| Rough electrical |
| Rough plumbing |
| Fireplaces including flues |
| Security and communications pre-wiring |
| Joist/SubFloor |
| Underlayment |
| Roof sheathing |
| Waterproofing |
| Gutters/downspouts/sheet metal |
| Roof Covering |
| Windows |
| Exterior doors |
| Exterior siding |
| Exterior trim |
| Stucco |
| Masonry veneer |
| Chimney |
| Garage |
| Garage doors |
| Exterior painting |
| Insulation |
| Drywall/plaster |
| Interior stairways |
| Cabinetry |
| Interior doors |
| Interior trim |
| Finish hardware |
| Countertops |
| Tubs/showers/enclosures |
| Interior painting and wall coverings |
| Hard surface finish - flooring |
| Carpeting |
| Appliances |
| Security system |
| Finish plumbing |
| Plumbing fixtures |
| Finish electrical |
| Lighting fixtures |
| Finish HVAC |
| Bath accessories |
| Tub and shower doors/mirrors |
| Finish grading |
| Pool/spa |
| Hardscape - driveway/walkway/steps |
| Landscaping |
| Fencing |
| Touch up - final clean up |
| Decks/porches |
| Final grading and seeding |
| Rental Equipment |
| Finish Basement Materials |
| Builder Contingency |
| Misc. |
| Exterior Sheathing |
| Temporary Utilities |
| Solar Panels |
| Radiant Heat |
| Footers |